Shenzhen, Guangdong Province, 中国 アジア太平洋地域
Cover Image
ケーススタディの要約:
The Dasha River Ecological Corridor focuses on the ecological restoration project in the Nanshan district of Shenzhen, China. The project, led by China Resources Land and master planned by AECOM, aims to restore the 18.8-kilometer watercourse that connects the coastal Nanshan district to the northern mountainous area of the city. The river faced pollution and disconnection from the community due to industrialization and misguided flood control measures. With the area's rapid urbanization and a population of 1.4 million people, the polluted river became an eyesore and a missed opportunity. To address these issues, authorities launched a rejuvenation program to restore the river's ecological health and reconnect it with the local community.

ケーススタディの要約:The Dasha River Ecological Corridor focuses on the ecological restoration project in the Nanshan district of Shenzhen, China. The project, led by China Resources Land and master planned by AECOM, aims to restore the 18.8-kilometer watercourse that connects the coastal Nanshan district to the northern mountainous area of the city. The river faced pollution and disconnection from the community due to industrialization and misguided flood control measures. With the area's rapid urbanization and a population of 1.4 million people, the polluted river became an eyesore and a missed opportunity. To address these issues, authorities launched a rejuvenation program to restore the river's ecological health and reconnect it with the local community.

関連
イベントライブラリ

2024 ULI Fall Meeting

ULI members convened in Las Vegas to network and hear world-renowned industry leaders share their insights on topics ranging from capital markets and the impact of AI and technology in real estate. Explore sessions from this year's 2024 ULI Fall Meet...
報告する

Switzer Canyon TAP Report

Switzer Canyon forms the linkage of two vibrant neighborhoods, and yet in its current state it is an unpolished gem. This TAP hopes to provide guidance on fostering changes to Switzer Canyon to improve and activate this area.
報告する

2024年レジリエンスサミットの概要と主要な結論

ULIの主要な気候適応イベントであるレジリエンスサミットは、不動産およびレジリエンスセクター全体の業界リーダーを集めて、気候関連リスクがもたらす課題に取り組み、機会を最大限に活用します。ニューヨーク市での今年のイベントの主なポイントを学ぶには、報告書全文をお読みください。
トピック